Road closures
Temporary Road Closure - Bail Street
Applicant: Nelson Marlborough Traffic Management
Event: The closures are to enable crane lifts for the development at 9 Bail Street
Proposed Closures: Bail Street – number 7 Bail Street to end of street
Date and time of scheduled closure: Road closures will occur periodically over the next 13 months (3 February 2024 – 1 April 2025) between the hours of 6:00 am and 6:00 pm.
Businesses and residents on Bail Street will be delivered a letter 48 hours prior to closures occurring.
Temporary Road Closure - Wakatu Lane - Trafalgar Street entrance
Applicant: Comans Construction
Event: Demolition and Construction of Building 7 Wakatu Lane and 51 Bridge Street.
Location: Wakatu Lane - Trafalgar Street entrance
Date and time of scheduled closure: Monday 11 March to Friday 28 February 2025 – Closed 24/7.
Note: this proposal is for an entire year.
The entrance will be open to vehicles and pedestrians over the Christmas Holiday period:
Date of opening for Christmas - 20 Dec 2024
Date of closure post-Christmas - 13 January 2025
Date of permanent re-opening - 1 March 2025
The closure is for the demolition of 51 Bridge Street and the construction of a new building.
Vehicle access to and from Wakatu Square will via Rutherford Street only.
No Pedestrian access will be available.
Temporary Road Closure - Washington Terrace
Applicant: Nelmac
Event: Renewal of the wastewater and water pipe along Washington Terrace
Location: Washington Terrace – full length
Date and time of scheduled closure: Monday 20 January to Friday 21 March 2025 – closed at all times for the duration of the work.
Temporary Road Closure - Washington Road/St Vincent Street Roundabout (NIGHTWORKS)
NIGHTWORKS
Applicant: Fulton Hogan
Event: Resealing the surface of the road with asphalt
Location: Washington Road/St Vincent Street Roundabout - and associated arterial streets:
- Washington Road – between Arrow Street & St Vincent Street
- Hastings Street – between Washington Road & Pioneer Crescent
- Watson Street – full length
- St Vincent Street – between Natalie Street & the Countdown Carpark
- Gloucester Street – between St Vincent & Vanguard Street
Date and time of scheduled closure: Sunday 9 February to Friday 21 February 2025 – 7:00 pm to 5:00 am (the roads will be closed overnight only – open during the day)
Contingency dates and times when closure may occur: Sunday 2 March to Friday 14 March 2025 – 7:00 pm to 5:00 am (the roads will be closed overnight only – open during the day)
Temporary Road Closure - Kawai Street
Applicant: Fulton Hogan
Event: Asphalt repairs to the surface of the road
Location: Kawai Street - between no.124 & no.116
Date and time of scheduled closure: Monday 17 February to Friday 21 February 2025 – 7:00 am to 6:00 pm
Contingency dates and times when closure may occur: Monday 24 February to Friday 28 February 2025 – 7:00 am to 6:00 pm
Proposed Temporary Road Closure - Chings Road
Applicant: Nelmac
Event: Resealing the surface of the road with asphalt
Location: Chings Road – full length
Date and time of scheduled closure: Thursday 20 February to Friday 21 February – 9:00 am to 3:00 pm (road will be open overnight)
Contingency dates and times when closure may occur: Thursday 27 February to Friday 28 February 2025 – 9:00 am to 3:00 pm (road will be open overnight)
Proposed Temporary Road Closure - Vanguard Street
Applicant: Fulton Hogan
Event: Chip sealing (resealing the surface of the road)
Location: Vanguard Street - between no.157 & no.213
Date and time of scheduled closure: Sunday 23 February 2025 – 7:00 am to 6:00 pm
Contingency dates and times when closure may occur: Sunday 2 March 2025 – 7:00 am to 6:00 pm
Temporary Closure - Torlesse Street
Applicant: Nelmac
Event: The closure is for excavating small holes to locate underground pipes (prior to installing a new water main)
Location: Torlesse Street – full length
Date and time of scheduled closure: Monday 24 February to Wednesday 26 February 2025 – 8:00 am to 6:00 pm (the road will be open overnight from 6:00 pm)
Contingency dates and times when closure may occur: Monday 3 March to Wednesday 5 March 2025 – 8:00 am to 6:00 pm
Proposed Temporary Road Closure - Atawhai Crescent
Applicant: Fulton Hogan
Event: Chip sealing (resealing the surface of the road)
Location: Atawhai Crescent – full length
Date and time of scheduled closure: Monday 24 February to Tuesday 25 February – 7:00 am to 6:00 pm
Contingency dates and times when closure may occur: Wednesday 26 February to Tuesday 4 March 2025 - 7:00 am to 6:00 pm
Temporary Road Closure - Collingwood Street
Applicant: Nelmac
Event: The closure is for excavating small holes to locate underground pipes (prior to installing a new wastewater system)
Location: Collingwood Street - from the Brougham Street intersection to the top of the street (no.240)
Date and time of scheduled closure: Tuesday 25 February to Wednesday 26 February 2025 – 9:00 am to 3:00 pm
Contingency dates and times when closure may occur: Tuesday 4 February to Wednesday 5 February 2025 – 9:00 am to 3:00 pm